Biochar project inputs
Biochar feedstock eligibility: what projects need to establish
Feedstock eligibility is about provenance, existing use, contamination, sustainability and evidence as well as biomass type. The assessment must follow the current methodology.
Technical overview reviewed September 2026
Beyond a species list
Eligibility is a claim supported by provenance
Naming the feedstock is only the start. A project must show where it came from, who controlled it, what would otherwise happen to it and whether its use creates environmental or social risk.
Positive lists and methodology categories can help screen a material, but current official rules should always be checked. A proposed feedstock may also require project-specific evidence or restrictions on the resulting biochar use.
The evidence file
What a project should be able to establish
Screening themes
Six issues that commonly decide project fit
Biomass origin
Records should identify the source location and production or collection activity, not only the immediate supplier.
Residual or waste status
The project may need to demonstrate why the material qualifies and describe its credible alternative fate.
Competing uses
Existing demand and the consequences of diversion can affect the baseline, leakage assessment and additionality case.
Contamination
Paint, plastics, treated wood, fossil material, soil, metals or other contaminants may affect eligibility and product use.
Sustainability
Harvesting practice, land impacts, supply pressure and applicable certifications may need to be evidenced.
Transport and moisture
Distance, mode, weight and moisture affect operations and lifecycle greenhouse-gas accounting.
Primary sources
Use the current rules for the selected route
Verra VM0044, Puro's Biomass Sourcing Criteria and the EBC/WBC positive list are examples of official sources that may inform an assessment. They are not interchangeable and their requirements can change.
From guidance to project design
Apply the requirements to a real project
CO2balance can review the feedstock, production system, end-use route and available evidence before a full project-development programme is defined.